Projects Undertaken as
PI
- “Addressing the Integrity and Security of River Basin Water Resources: Demonstration of an innovative concept framework” under SPARC Scheme, Funded by Ministry of Education, Duration: Sep. 2023 – Aug. 2026 (Newly Undertaken)
- “Estimation of freshwater discharge at river mouth to Ocean through Altimetry and Hydrological modelling techniques (SAMUDRA-II)”, Funded by the Space Applications Center, ISRO, Duration: Oct. 2021 – Mar. 2024 (Ongoing since October 2021)
- “Development of a network of indigenous Internet of Weather Things (IoWT) for observing rainfall over an entire river basin”, Funded by IIT Delhi under FIRP Project 2021, IRD, IIT Delhi, Duration 1 year (Ongoing since July 2021)
- “Urban Water Management to address Water Security of NCT Delhi”, Funded by Northern Benevolent Fund, Duration: 3 years (Ongoing since June 2021)
- “Indigenous Sensor based Real Time Flood Warning Smart System”, Funded by Indian Space Research Organisation (ISRO) through Space Technology Cell; Duration: 3 years (Ongoing since June 2021)
- “A Unified Land Surface-Subsurface Information System for Water Management of A Tropical Basin”, Funded by Department of Science & Technology DST (International Bilateral Cooperation Division) through “Project-based Personnel Exchange Programme with India - Indo-German Joint Research Collaboration - DAAD / Department of Science and Technology (DST)”; Duration: 2 years (Completed)
- “Water Security” vertical, Delhi Science and Technology Cluster (DRIIV), Funded by the Office of Principal Scientific Advisor, Duration: 3 years (from Dec. 2019 – Dec. 2020) (Completed)
- “Water Security and Sustainable Development Hub – Consortium Project", Funded by Global Challenges Research Fund (GCRF), Led by Newcastle University, UK; Duration: 5 years (Ongoing since Feb. 2019)
- “Towards the Development of a Land Data Assimilation System for Improved Drought Monitoring and Prediction”, Funded by Science and Engineering Research Board (SERB), Department of Science and Technology (DST) under Women Excellence Award Scheme; Duration: 3 years (Completed)
- “CGanga @ IIT Delhi (MASTER PROJECT)” and “Investigating the River Characteristics and Hydrologic Flux Changes across the River Ganga”, Funded by Centre For Ganga River Basin Management and Studies; Duration: 2 years 8 months (Completed)
- “Water - Energy - Climate Nexus: Risk and Resilience of India's Power Grids under Changing Climate”, Funded by IIT Delhi under FIRP Project 2017, IRD, IIT Delhi, Duration 2 years (Completed)
- “Integrated hydro-economic framework for basin-scale water quality and quantity management” Funded by Shastri Institutional Collaborative Research Grant (SICRG), Indo-Canada Institutional collaboration between IIT Delhi and University of Saskatchewan, Canada; Duration: 2 years (Completed)
- “Investigation of Environmental Flow Requirements considering Water Quality Constraints”, Funded by SERB, DST under Extra-Mural Research Funding; Duration: 2 years (Completed)
- "Regional Scale Hydrological Modeling for Climate Change Impact Assessment", Funded by DST under Fast-Track Scheme; Duration: 3 years (Completed)
- “Nonlinear Behaviour and Predictive Uncertainty of Hydrological Variables”, Funded by IRD, IIT Delhi; Duration: 1 year (Completed)
Projects Undertaken as
Co-PI
- “Addressing the Integrity and Security of River Basin Water Resources: Demonstration of an innovative concept framework” under SPARC Scheme, Funded by Ministry of Education, Duration: Sep. 2023 – Aug. 2026 (Newly Undertaken)
- “Estimation of freshwater discharge at river mouth to Ocean through Altimetry and Hydrological modelling techniques (SAMUDRA-II)”, Funded by the Space Applications Center, ISRO, Duration: Oct. 2021 – Mar. 2024 (Ongoing since October 2021)
- “Development of a network of indigenous Internet of Weather Things (IoWT) for observing rainfall over an entire river basin”, Funded by IIT Delhi under FIRP Project 2021, IRD, IIT Delhi, Duration 1 year (Ongoing since July 2021)
- “Urban Water Management to address Water Security of NCT Delhi”, Funded by Northern Benevolent Fund, Duration: 3 years (Ongoing since June 2021)
- “Indigenous Sensor based Real Time Flood Warning Smart System”, Funded by Indian Space Research Organisation (ISRO) through Space Technology Cell; Duration: 3 years (Ongoing since June 2021)
- “A Unified Land Surface-Subsurface Information System for Water Management of A Tropical Basin”, Funded by Department of Science & Technology DST (International Bilateral Cooperation Division) through “Project-based Personnel Exchange Programme with India - Indo-German Joint Research Collaboration - DAAD / Department of Science and Technology (DST)”; Duration: 2 years (Completed)
- “Water Security” vertical, Delhi Science and Technology Cluster (DRIIV), Funded by the Office of Principal Scientific Advisor, Duration: 3 years (from Dec. 2019 – Dec. 2020) (Completed)
- “Water Security and Sustainable Development Hub – Consortium Project", Funded by Global Challenges Research Fund (GCRF), Led by Newcastle University, UK; Duration: 5 years (Ongoing since Feb. 2019)
- “Towards the Development of a Land Data Assimilation System for Improved Drought Monitoring and Prediction”, Funded by Science and Engineering Research Board (SERB), Department of Science and Technology (DST) under Women Excellence Award Scheme; Duration: 3 years (Completed)
- “CGanga @ IIT Delhi (MASTER PROJECT)” and “Investigating the River Characteristics and Hydrologic Flux Changes across the River Ganga”, Funded by Centre For Ganga River Basin Management and Studies; Duration: 2 years 8 months (Completed)
- “Water - Energy - Climate Nexus: Risk and Resilience of India's Power Grids under Changing Climate”, Funded by IIT Delhi under FIRP Project 2017, IRD, IIT Delhi, Duration 2 years (Completed)
- “Integrated hydro-economic framework for basin-scale water quality and quantity management” Funded by Shastri Institutional Collaborative Research Grant (SICRG), Indo-Canada Institutional collaboration between IIT Delhi and University of Saskatchewan, Canada; Duration: 2 years (Completed)
- “Investigation of Environmental Flow Requirements considering Water Quality Constraints”, Funded by SERB, DST under Extra-Mural Research Funding; Duration: 2 years (Completed)
- "Regional Scale Hydrological Modeling for Climate Change Impact Assessment", Funded by DST under Fast-Track Scheme; Duration: 3 years (Completed)
- “Nonlinear Behaviour and Predictive Uncertainty of Hydrological Variables”, Funded by IRD, IIT Delhi; Duration: 1 year (Completed)
- “Design and development of Measuring Device for measuring and recording hydrological parameters in a Climate Zone Observatory for self-reliance and water security”, Funded by DST; Duration: 3 years (Ongoing since March 2022)
- “Analysis of Evacuation Options considering Citizen Mobility Patterns and Disaster Vulnerability in a Himalayan Region Transportation Network (Joint Project with IIT Ropar & IIT Palakkad, Kerala)”, Funded by National Mission on Himalayan Studies (NMHS); Duration: 3 years (Ongoing since October 2019)
- “Design and Demonstration of Sustainable Building Infrastructure”, Funded by Yardi Systems, USA; Duration: 3 years (Ongoing since June 2019)
- “Advanced Technologies for Post-Disasters Reconnaissance, Forensic and Environmental Impact Studies – Geotechnical”, Funded by Ministry of Human Resource Development (MHRD) under SPARC Scheme; Duration: 3 years (Ongoing since March 2019)
- "Integrated low-cost water sensors for real-time river water monitoring and decision-making", Indo-US collaborative project, Funded by DST; Duration: 5 years (Completed)
- "Monitoring & Management of Urban Flooding using a Crowd-sourcing Technique", FLOOD-EVAC: Indo-German Project, Proposal under Co-operation in Civil Security Research between India and Germany, Funded by DST; Duration: 3 years (Completed)
- "Water Resources Studies of Large basins", Funded by International Centre of Excellence in Water Resources (ICE WaRM), Australia; Duration: 3 years (Completed)